Latest Overnight I-195 Shutdown Clears Way for Bridge Demo
☁ 66°F Fog/Mist · ProvidenceFORECAST
PROVIDENCE, RI · GREATER PROVIDENCE EDITION · FRIDAY, NOVEMBER 6, 2026
HERE City Network
HEREProvidence
Why It Matters. HERE!
Traffic

Overnight I-195 Shutdown Clears Way for Bridge Demo

Published November 6, 2026 at 5:35 am | By Donald Hunt, Staff Reporter

Cars on a divided highway

EAST PROVIDENCE, R.I. — Drivers crossing East Providence on I-195 will lose both directions overnight Friday after state highway crews take the Potter Street overpass out of service for a planned tear-down.

RIDOT set the hard close for 10 p.m. Friday beside the Taunton Avenue interchange and expects every lane back Saturday by midday. The overnight window is meant to finish the span removal in one push instead of weeks of staggered lane hits.

The work feeds the Washington Bridge rebuild. Over the coming 12 to 18 months, crews will put up a replacement Potter Street crossing so westbound I-195 can widen, including space for another westbound lane and a Waterfront Drive exit. The larger rebuild is tracked through late 2028 after the westbound Washington Bridge shut in December 2023 over failing components, with the construction package listed near $427.9 million.

HERE CITY BUSINESS DIRECTORYOwn a business in Providence? Get listed HERE.Free basic listing. Premium features available.
ADD YOUR BUSINESS →

Eastbound traffic will leave at Exit 1D and roll along Warren Avenue about a mile before rejoining the freeway. Westbound traffic will peel off at Exit 2 onto Broadway, then use Warren Avenue for roughly three-quarters of a mile and re-enter on a temporary ramp. Broadway between Warren Avenue and Freeborn Avenue will stay blocked, and three westbound on-ramps will remain shut during the window.

Interim RIDOT Director Robert Rocchio said the Friday overnight stretch is the lightest of the week and that the agency needs about three of every 10 regular users to stay off the corridor. Without that diversion, he warned, local streets could clog fast.

Mayor Bob DaSilva said roughly 30 extra police and traffic-control workers will cover the Warren Avenue corridor, with an added rescue unit on duty. He called the disruption necessary and said the department leafleted homes and shops beforehand. A flood watch covers the state from early Friday into Saturday morning, with about 2 to 4 inches of rain possible; RIDOT said wet weather usually does not stop demolition.

CRIME WATCH SPONSOR — ADT Security — Always there. Always on.
GET A QUOTE →
📅 This space available in 3 days — local advertisers get priority. Claim it →

Section: More Providence RI crime news

Filed under: Providence RI Traffic News

What's Happening
When does I-195 close?
Both directions near Taunton Avenue from 10 p.m. Friday until lanes reopen Saturday midday.
Why the shutdown?
Crews are demolishing the Potter Street Bridge as part of the Washington Bridge rebuild.
Where do drivers go?
Eastbound via Exit 1D Warren Avenue; westbound via Exit 2 Broadway onto Warren Avenue.
Donald Hunt
HERE Providence · TRAFFIC

Donald is a staff reporter for HERE Providence covering local news, community stories, and developments across Providence County. Donald is committed to accurate, community-first journalism.

Contact Donald
HEREmention Get Your Business Found in AI BE THE ANSWER. When customers ask ChatGPT, Perplexity, or Google AI who to hire — your name comes up. Learn More

TRAFFIC NEWS NEAR PROVIDENCE RI

Traffic coverage from the 10 closest HERE cities.